There wasn't a lot of work we could do this week. Monday was our most productive day. Myles finished soldering and I made all the connections (finding cords that worked with the equalizer, amp, and auxiliary input). When we first tested it sound only came out of one speaker. We thought this was because of a bad solder. Myles redid that quickly. The second test was successful but the sound would stop every once and a while. This was because of the auxiliary connection was bad. We went to the sound room to try to find a better amp input to auxiliary. We lucked out and found a guitar amp to auxiliary. It was small and the connection was great. That was the end of the day.
Tuesday we went down to Ace to get one more hose barb. We decided that we'd use the two we used for the Rubens tube to save money. For the Rubens tube we used a t-splitter because we had 3 lines for gas to go through. The box requires one more line. While at Ace we searched many isles for this connector (a 4 way splitter). It wasn't anywhere to be found. We decided that we could just order it. When we got back to school I took all the hose barbs out of the pipe and then put them back into the bag with the rest of our parts. I had brought in my brothers watch. It had stopped working. I tried resetting it like the directions said to do but I couldn't figure out how to do that. Trying to figure out how to fix the watch took up the remainder of my day.
Wednesday I didn't have a lot of time to work because of Advisory Olympics. I also didn't have a lot of work to do. To start the day I had to resend the file to Jack because The file we sent his friend that's helping us out was the wrong type of file. I exported the file as a .dwg because Jack's friend told us that would work. I then sent that to Jack who then forwarded it to his friend. After that I had no work to do so I worked on Mike's tracing assignment. The image I chose to trace was very detailed and it took me the rest of the day to finish.
Thursday I spent my day catching up on my blog then working on the next step for Mike's tracing assignment. Myles and I couldn't think of anything else we could work on for our Rubens box.
Friday I still couldn't do anything except for wait for a response from Jack's friend about making our box. Since I couldn't do anything I did assignments from Mike's class that I needed to finish. I read the 5 chapter I needed to read for my book club. I also finished the photoshop tracing and coloring.